REPORTS & RESULTS
The Dynamic Perspective of the Energy Performance Certification (EPC)
Project Reports
D1.1 EPC regional report: Report detailing energy certification status and trends in EU28. (Available from January 2021)
D1.2 Operational dynamic Energy Perfomance Certificate (EPC) specifications: Report describing dynamic EPC operational parameters and specifications. (Available from January 2021)
D1.3 Application scenarios: Report describing the expectations and requirements of the end users regarding replacing steady-state with dynamic EPC, the use case management teams and advisory board additions. (The Report is of Confidential (CO) Dissemination Level)
D2.1 Application Information Model: Process of integrating different types of data based on availability including top-level design of the system and the internal processes & the technical memorandum for data quality assurance. (The Report is of Confidential (CO) Dissemination Level)
D2.2 Inspection process: Inspection and monitoring plan finalized process. (Available from March 2022)
D2.2 (Result 1) Building Inspection Form (Available from March 2022)
D2.3 Smartness scalability report: Process for assessing DEPC implementation depending on existing and desired smartness level of the installation. (Available from March 2022)
D2.4 E-DYCE protocol: Consolidated DEPC process documentation, featuring protocols for each process and component. (Available from March 2022)
D3.1 Dynamic simulation platform: Software and associated designs of platform capable of integrating various simulation modules and tools. (Available from March 2022)
D3.2 Free running module: Simulation module integrating free running operation in DEPC including the calculation of the free-running potential. (Available from March 2022)
D3.3 Real time engine: Protocols for RT integration of sensor readings to DEPC. Module to convert monitored weather data into simulation input. (The Report is of Confidential (CO) Dissemination Level)
D3.4 Prediction module: Module for supply / demand prediction. (The Report is of Confidential (CO) Dissemination Level)
D3.5 Model simplification: Simplification of building details – testing reliability of results from Assessment Tool (AT) (The Report is of Confidential (CO) Dissemination Level)
D4.1 E-DYCE application User Interface (UI): Interface integrating E-DYCE functions and assessment tool. (The Report is of Confidential (CO) Dissemination Level)
D4.2 Renovation Roadmap DSS (Decision Support System): Software based DSS generating renovation scenarios based on optimization and cost. (Available from September 2022)
D4.3 Living lab testing report: Report on model testing in controlled environment. (Available from September 2022)
D4.4 Correction utility: Correction tool for calculating the impact of smart technologies. (The Report is of Confidential (CO) Dissemination Level)
D5.1 Case study monitoring report: Report on overall use case progress, data collection and feedback generated.
D5.2 Case study report #1 and #5 Geneva: Report of site-specific decisions, actions and process of DEPC implementation for Geneva.
D5.3 Nicosia case study report: Report of site-specific decisions, actions and process of DEPC implementation for Nicosia.
D5.4 Torre Pellice case study report: Report of site-specific decisions, actions and process of DEPC implementation for Torre Pellice.
D5.5 Danish case studies report: Report of site-specific decisions, actions and process of DEPC implementation for Denmark.
D5.6 Demonstration and policy contribution report: Report on demonstration activities across all sites. (Available from September 2023)
D6.1: Project Website: A project website will be developed and also continuously updated with project progress information. It will also include all developed dissemination instruments / assets. (Available from December 2020)
D6.2: 1st Interim Plan for Exploitation and Dissemination of Results (PEDR): The 1st version of PEDR; IPR and knowledge management; exploitation and dissemination plans; dissemination activities enacted; events organised and/or attended; press releases, publications, promotional video clips, Social Media profiles. (The Report is of Confidential (CO) Dissemination Level)
D6.3: 2nd Interim PEDR: Update for the 2nd project year; similar structure as D6.2 (The Report is of Confidential (CO) Dissemination Level)
D6.4: Final PEDR: The final PEDR version covering the whole project duration. In addition to previous versions, this will also address exploitation results, additional financing secured and investment plans, innovation management activities and their conclusions. (The Report is of Confidential (CO) Dissemination Level)
D6.5: Standards and regulations report: Report detailing the standards employed, contribution to emerging new standards, adherence to EU and national regulation and policy impacts. (The Report is of Confidential (CO) Dissemination Level)
D7.1 Data Management Plan (DMP): The plan will describe ways to manage all research data and metadata, during and after the project duration, as open data sets, means to access, license attached, updating, etc. (The Report is of Confidential (CO) Dissemination Level)
D7.2 Risk mitigation plan: Report addressing existing risks, constantly updated with emerging ones. (The Report is of Confidential (CO) Dissemination Level)